Scope changes reach teams late.
Keep scope decisions and revisions attached to work.
Keep store operations, contractors and project teams aligned through every phase of a remodel.
When construction and trading overlap, a late inspection or unfinished work area can disrupt the reopening plan. Track each handover as part of the schedule.
Keep scope decisions and revisions attached to work.
Connect site access, phased work and inspections.
Capture photo evidence and operating readiness before handover.
Plan repairs and upgrades, coordinate contractor access, and verify the existing location is ready for handover.
Set up the condition survey, drawings and budget, contractor mobilization, trade work, finishes, inspections, and closeout.
Reuse the plan at the next location.Start a site project and assign contractors, dates, and work windows for that location, including any mall holiday construction freeze.
Keep the refit aligned with trading hours.Route drawing and budget approval, and confirm the landlord’s alteration requirements before scheduling crews.
Give contractors the approved scope and access plan.Contractors open a secure task link to post work-zone updates, inspection evidence, and punch-list fixes, with no login or app download.
Know when each area is ready for operations.Retainage often goes out before closeout is done. Gate the handover on photo-verified punch items, as-built drawings, and lien waivers, then have Facilities sign off before Store Operations accepts the work.
Resolve outstanding punch-list items before reopening.Follow delayed electrical work through inspection and handover to the projected reopening date.
Adjust access and reopening plans while there’s time.Give contractors and facility teams one sequence for trade work, inspections, punch lists, and the closeout package: as-built drawings, lien waivers, and O&M manuals.
Use the Remodel / Refit template
Treat it as an occupied build. Set operating constraints when you start the site project, then link phased work, access windows and operating handovers.
Yes. Send secure links for the specific updates, forms and approvals they need to complete.
Link reopening to substantial completion, inspection and store operations checks, and review the evidence before closing the project.
Record the condition survey, drawings, budget, and work by trade, including mechanical, electrical, and plumbing work where applicable.
Create separate tasks for landlord approvals, work windows, and inspections, and attach them to the milestones they affect.
Know which projects are on track, where work is stuck, and who needs to move next. Bring every project update into one connected view.
Start your 15-day free trial